| Flat Category |
Super Area |
| 2 B/R Drawing Dining + 2 Toilets |
1015 Sq.Ft. |
| 2 B/R Drawing Dining + 2 Toilets + Study
|
1150 Sq.Ft. |
| 3 B/R Drawing Dining + 2 Toilets + Puja / Store
|
1455 Sq.Ft. |
| 3 B/R Drawing Dining + 2 Toilets + Study
|
1535 Sq.Ft. |
| 3 B/R Drawing Dining + 3 Toilets + Study |
1645 Sq.Ft. |
| 3 B/R Drawing Dining + 4 Toilets + Dress + Study
|
1860 Sq.Ft. |
| 4 B/R Drawing Dining + 4 Toilets + Dress + Study |
2340 Sq.Ft |
| Sale Price Under Flexi Plan |
| Ground |
4400 |
7th |
4260 |
| 1st |
4380 |
8th |
4240 |
| 2nd |
4360 |
9th |
4220 |
| 3rd |
4340 |
10th |
4200 |
| 4th |
4320 |
11th |
4185 |
| 5th |
4300 |
12th |
4170 |
| 6th |
4280 |
14th |
4155 |
| Other Charges of Skytech
Matrott |
| Open Parking |
Free |
| Interest Free Maintenance (IFMS) |
Rs. 40/- Per Sq.Ft. |
| External Electrification Charges (EEC) |
Free |
| Fire Fighting |
Free |
| Club Membership |
Free |
| Power Back-Up |
Free 1 KVA |
| Lease Rent |
Rs. 95/- Per Sq.Ft. |
| PREEFERRED LOCATION CHARGES |
| Central park facing |
Rs. 75/- Per Sq.Ft. |
| Road facing |
Rs. 75/- Per Sq.Ft. |
| A) Down Payment Plan |
| At the time of booking
|
10% of (Basic Cost + PLC) |
| Within 45 Days of booking |
85% of (Basic Cost + PLC)+Lease Rent + Car Parking |
|
At the time of Offer of possession |
5% (Basic Cost + PLC) +IFMS+F.F.C +E.E.C+Club charges Power Back up |
| (B) Flexi CLP Payment Plan |
| At the time of booking |
10% of (Basic Cost + PLC) |
| At the time of Excavation
|
30% of (basic cost+ PLC) +|50% of Lease Rent |
| At the time of Basement Casting |
10% of (basic cost + PLC) +50% of Lease Rent
|
| At the time of 3rd Floor Casting |
10% of (basic cost + PLC) + 50% of Car Parking |
| At the time of 6th Floor Casting |
10% of (basic cost + PLC) +50% of Car Parking |
| At the time of 10th Floor Casting |
10% of (basic cost +PLC) |
| At the time of 14rd Floor Casting |
10% of (basic cost + PLC) |
| At the time of External Plaster |
5% of (basic cost + PLC |
| At the time of offer of possession |
5% of (basic cost + PLC)+I.F.M.S+F.F.C+E.E.C +Club Charges+Power Back up |
| (C) Construction link Plan |
| At the time of booking |
10% of (Basic Cost + PLC) |
| 1st Installment at the time of Excavation
|
10% of (Basic Cost + PLC)+ 50% of Lease Rent |
| 2nd Installment at the time of raft casting |
10% of (Basic Cost + PLC)+ 50% of Lease Rent
|
| 3rd Installment at the time of 1st Floor casting |
10% of (Basic Cost + PLC)+ 50% of Car Parking |
| 4th Installment at the time of 4th Floor casting |
10%of (Basic Cost + PLC) + 50% of Car Parking |
| 5th Installment at the time of 6th Floor casting |
10% of (basic cost + PLC) |
| 10% of (basic cost + PLC) |
10% of (basic cost + PLC) |
| 7th Installment at the time of 12th Floor casting |
10% of (basic cost + PLC) |
| 8th Installment at the time of 14th Floor Casting |
10% of (basic cost + PLC)p |
| 9th Installment at the time of Esternal Plaster |
5% of (basic cost + PLC) |
| At the time of Offer of possession |
5% of (basic cost +PLC) +I.F.M.S+F.F.C+E.E.C+ Club Charges + Power Back up |
NOTE- Payment should be made in favor of “Skytech Constructions Pvt Limited”
- Individual Electric Meter connection & Stamp Duty / Registration Charges / Service tax & any other governmental charges shall be extra as applicable.
|