| Number of Floors |
| Block A |
Ground + Four Floors |
| Block B |
Ground + Fifteen Floors
Three level basements
|
| Site Area |
| Building Height |
| Floor to Floor |
Ground floor 4.200 m
Typical floor 3.675 m
Basements 3.750 m
|
| Floor to ceiling |
Ground floor 3.925 m
(floor to soffit of slab)
|
| Typical floor |
3.400 m (floor to soffit of slab) |
| Total Height |
| Block-A |
21.6 m |
| Block-B |
60.000 m |
| Elevators |
| Block-A |
Four nos x 16 passengers with speed of 1.5m/sec
+ one service elevator
|
| Block-B |
Six nos x 16 passengers with speed of 2.5m/sec
+ one service elevator
|
| Restaurant |
| 150 sqm Coffee Pavilion in Front Park |
| Other features |
| Atrium for leisure activities and Retail Outlets/ ATMs Independent access to each block 2.5 acre landscaped park |
| Structural System |
| Foundation |
Isolated foundations |
| Floor Slab |
250mm thick flat slab with drop panels of 450 mm thickness
(8.1 m x 8.1 m spans in Block-A
9.0 m x 9.0 m spans in Block- B)
|
| Typical Column Sizes |
750 mm x 750 mm , 600mm x 1200 mm , 900mm x 900mm |
| External facade |
| Double glass structural glazing for better noise control Granite cladding Alucobond cladding |
| Flooring |
| Atrium |
Granite/ Marble |
| Entrance & Lift lobbies |
Granite |
| Basement |
Concrete with non-metallic floor hardener |
| Tenant floor finish |
75mm clearance left |
| Passenger Lift Cab |
SS panels/ mirror, Granite flooring |
| Toilets |
Floors & Walls in Ceramic tiles |
| Finishes |
| Signage |
Brushed Stainless Steel |
| Entrance Lobby |
Granite cladding/ Veneer on walls with Reception/ Security Desk |
| Typical lift lobby Finish |
Granite cladding/ Veneer paneling on walls |
| Parking |
| Basement parking |
540 cars |
| Parking at ground level |
140 cars |
| Security |
| Access Control |
Control barrier with electronic card swipe |
| CCTV Cameras |
Main Entrance, Main lift lobby, Service entrance First Basement lift lobby |
| CCTV monitoring from multiplex central station, with Pan, tilts, zoom and recording facility. |
| Access Control |
| Control barrier with electronic proximity cards at ramp entrances. |
| Staircase |
| One main staircase and one fire escape staircase in each
block
|
| Travel Distance |
| Maximum travel distance:
30m
|
| Wet riser/ Hose reels |
| Adjacent to each staircase |
| Sprinklers |
| Fully provided in all parts of the building as per National Building Code of India norms. Tap off connections provided for below the false ceiling installations to be done by the tenant. Sprinkler flow switches connected through monitor module to building fire alarm system. |
| Yard Hydrants |
| Provided at ground level as per NBC norms. |
| Hand-held extinguishers |
| Provided as required in landlord's areas |
| Fire Fighting Pump |
| Two nos. main fire electric pumps (Near UG tank only)
Cap. 2850 lpm, 110 m head Two nos. fire jockey pumps
Cap. 180 lpm, 110 m head, One no. common diesel engine
driven stand by pump, Cap. 2850 lpm, 110m head
|
| Fire Tanks |
| Underground static tank:
2,50,000 litres
50,000 litres {On top of Block-B (G+15)]
|
| Fire Alarm System |
• Hybrid Fire alarm system with Addressable main fire alarm panel located in Security & Fire Control Room on Ground Level along with repeater Panel in Security room.
• Adequate provision for installation of addressable or conventional fire alarm devices / panels at all levels for tenants requirements.
|
| Air conditioning |
• Central Chilled Water type with combination of Screw Chiller and Centrifugal chiller.
• Two nos. Air Handling Unit rooms on each office floor Thermal storage to meet peak load. Heat Recovery Units
|
| Capacity |
| 1300 TR equivalent including Thermal storage and Heat Recovery Units. |
| Round the Clock Cooling |
| Extra cooling towers to run tenant package units for devices such as Server, UPS etc. |
| Piping and Ductwork |
| Chilled Water piping from A.C. Plant to Air Handling units. Common link area complete with ducting and grills. Ductwork from air handling units capped off at tenant’s areas with fire dampers. |
| BMS and Controls |
| Hands free operation and monitoring the principle operations of the building control system fully integrated with the security, fire alarm and lift control systems. |
| Ventilation and Exhaust |
| Provided for toilets, cores and basements. Separate ventilation
for DG. Room with air cooling for increased efficiency.
|
| Plumbing |
| Sanitary Fittings |
Fixtures provided only at ground level toilets and toilets on floors with more than one occupant. Tenants to plan their own fixtures as per interiors. In common area there shall be an emphasis on water conservation, better hygiene and ease in maintenance. Low volume flushing EWC (4-6 litres) with concealed flush valves Quarter turn taps in wash basins with external thermostatic mixers for better hygiene and human safety. Angle valves with micron filter Anti-cockroach traps in floor traps for better hygiene. |
| Accessories |
Emphasis on better hygiene and ease in maintenance ABS plastic international accessories e.g., toilet paper holders, liquid soap dispensers, toilet seat cover dispensers |
| Storage |
Underground tanks Raw Water Tank 1,50,000 litres Treated Water Tank 4,00,000 litres |
| Cold Water Supply |
Emphasis on water conservation and better hygiene All water supply shall be filtered. Separate water supply piping circuits for flushing, domestic/ soft water and drinking water. Centralized R.O. plant for drinking water supply planned for tenants.
Flushing water supply through gravity. Domestic / soft water supply through hydro-pneumatic system located at basement level. Drinking water supply through separate pipe-work. Only drinking water supply to be metered.
All toilet cores to be provided with valved off flushing and domestic water supply. Outlet pressure at each floor to be limited to maximum 3 bar.
|
| Hot water supply |
Provision for geysers at each toilet. Geysers to be provided by
tenants.
|
| Water Treatment |
Filtration plant for flushing water. Filtration and softening plant for soft water supply to cooling tower make-up and domestic water supply R.O. drinking water plant |
| Soil, waste and vent pipes |
Emphasis on easier installation and ease in maintenance. Two pipe vented system to be used in toilets. No sinking in toilets and kitchen and pipes to be exposed from lower floor ceiling. All vertical pipes to be in accessible shafts. In addition to main toilet block, provision made at two additional locations for future layout of toilets/ pantry/ cafeteria. |
| Plant room |
At lower basement level housing all water supply pumps and water filtration and softening equipment. |
| Sewerage |
Building sewer to be connected to municipal sewer. Grease trap planned for kitchen areas at three locations. |
| Storm water drainage |
All roof water shall be collected in underground lines and discharged in underground aquifer by use of detention tank and recharge well. All surface water to be recharged by soak pits. Total rainwater harvesting scheme planned. |
| HSD bulk oil storage tanks |
An underground HSD oil storage tank of 20KL is planned for storage of High Speed Diesel for DG sets. The oil tank yard shall be barricaded as per CCE norms. |
| Overhead water tanks |
| Block A |
Flushing Water Tank 15,000 litres
Soft water tank Tank 15,000 litres
|
| Block B |
Fire tank 50,000 litres
Flushing Water Tank 15,000 litres
Soft water tank Tank 20,000 litres
|
| Electricals |
| Power Supply |
Power supply made available from DHBVNL at 11KV supply system. |
| Sub-Station |
11Kv Outdoor type sub-station isolated from main building complex with 2 no 2000 KVA Transformer and HT control through 11KV HT vacuum circuit breaker. |
| Power conditioning |
OLTC installed on transformers, voltage range (+5 to -20%) |
| LV Switchgear |
LV Switchgear used in the installation conforms to IEC specifications as well as international standards. Provides long term safety, unparalleled ruggedness, excellent performance as well as easy installation, operation and maintenance. |
| LT Distribution |
LT distribution for all users to be carried out through Bus Duct
Risers obtained from reputed manufacturer. Four sets of bus
duct risers have been used to provide proper load distribution
in the complex.
|
| Load Available for User |
System has been planned to provide adequate load for Lighting, Small Power & UPS needs of each user keeping in mind computer requirements.
In addition to the maximum demand load on each floor, adequate arrangement has been made for critical needs like Server Room load as well as its air-conditioning required for night hours.
|
| Critical / Emergency Lighting |
Emergency lighting has been provided for all Common areas, Staircases, Escape Routes and Lift Lobby. |
| Fire Tanks |
Underground static tank 1, 35,000 litres Terrace Tanks |
| Dedicated Earthing |
Complete infrastructure has been laid for all users to enable them to provide their own dedicated earthing system for various requirements. |
| Suppression of Harmonics |
Special capacitors have been used to account for harmonics present in the system due to non-linear loads. Adequate sizing of neutral bus bar has been carried out in bus duct risers to keep the installation safe from harmonics generated due to computer loads. |
| Back up Power Supply System |
100% backup power supply system shall be available in the complex. DG Sets shall be economical to minimize operating costs and environmentally compatible to fulfill stringent exhaust emission standards. These shall be provided with electronic monitoring system, shall be modern engine design with optimized combustion system. Compact and easy to install with low fuel consumption resulting in reduced operating costs.
4 nos 1000 + 1 no. 500 KVA DG sets shall be used to provide backup power for the entire maximum demand load of the complex and these shall be PLC based auto synchronized, auto load sharing and auto load management.
Adequate diesel storage capacity has been planned to provide operation of standby DG Sets for at least 60 hours.
|
| Internal |
Brushed stainless steel signage in statutory exits Entrance lobby directory for all tenants |
| Maintenance areas |
Toilets ,
Janitor's cupboards
|
| External |
Stone / Aluminium / Stainless steel building signage at entrance |
| Provision for Communications System |
Along with necessary P & T lines for each user, infrastructure facilities have been provided to receive various communication links as well as broad band fiber optic cables etc.
Structural provision has also been made on roof top to enable each user to install V-SAT antennas as well as satellite dish for their communication requirements.
|
| Exterior Maintenance Access |
Window Cleaning System |
| Roadways & Surface Parking |
Concrete paving in main drive way and drop off Grasscrete and interlocked concrete precast pavers in other areas |
| Pedestrian and Roadway Lighting |
Pole mounted fixtures and custom designed granite finished bollard lighting |
| Building Façade Lighting |
Feature lighting of façade with fixtures concealed within landscaped and other areas |
| Site Landscape |
Granite paving in different finishes on plaza and atrium Total approximately 2.5 acres of landscaped areas with sunken court with coffee pavilion for sit out. |